Our team has begun working on the design phase of a Laboratory in Irvine, CA. This project is 4,200 square feet and will include a 2,000 square foot lab that will test cannabis product quality before consumption by consumers.
top of page
Recent Posts
See AllNEC continues progress on the MEP engineering for two cannabis greenhouse cultivation facilities located in St. Louis totaling 100,000 square feet. This project consists of a three pipe reticulated h
We are excited to have the opportunity to design and engineer a complete re-pipe of this 12-story, multi-family residential building located in the heart of Los Angeles. Originally built in 1922 as a
National Engineering is excited to have the opportunity to design a custom aeroponics-based cultivation project in central-coastal California. This project includes many design concepts which are diff
bottom of page